CHURCH PA BUILD -- STAGE MONITORS | |||||||
|
|||||||
|
|||||||
|
|||||||
Here are the four monitors before assembly and final Duratex coating. They are set up for daisy chaining with Speakon jacks on both sides of the boxes. More work than they should have been. Inside was liberally stuffed with foam and some dacron. |
|||||||
The finished monitor. I found I needed 6 screws to hold the grills, and some weather stripping to keep the steel from buzzing against the wood. I was too burned out to look for darker weather strip. |
|||||||
|